Official Sites - source of much of the information here Mt. Baker-Snoqualmie National Forest - Alerts and Notices Road and Trail Conditions Okanogan-Wenatchee National Forest - Current Conditions Olympic National Forest - new Current Conditions page is now available Olympic National Park - Current Road Conditions hotline 360-565-3131 Mt Rainier National Park - Current Road Conditions hotline 360-569-2211 press 2 then (2 for current road conditions or 3 for anticipated opening/construction projects) Gifford Pinchot National Forest - Alerts & Notices Washington State DOT - Mountain Passes Naches Ranger District - Conditions Wenatchee River Ranger District - Conditions In general, post in alphabetical order by common road name within each section unless there are more natural geographical groupings (e.g. North Fork XXX, South Fork XXX) Mount Rainier Corral Pass (FS 7174) Closed since 2015 fire, campground area high severity fire with many hazardous trees. Chinook Pass (SR 410) website Mowich Lake Road (SR 165) Mowich Lake, Spray Park, Echo/Observation Rock Typically opens in July Stevens Canyon Road Grand Park back door, Huckleberry Creek Rd 73, Was in good condition 2023 all of the way to Lonesome Lake I-90 Talapus (9030), Mason Lake (9031)? Cold Creek Road (9070) to Windy Pass and PCT 7-22-2022 Drove to Mt Catherine TH in Subaru Forester. Several sections of serious potholes. Two sections with parallel gullies along the length of the road. Once the fall rains start those gullies will collect water and I suspect serious road damage will result. Joey Tinkham (55), Good condition as of Fall 2023. May have logging traffic from Hansen Creek in 2024. Garcia (9020) ? Middle Fork Snoqualmie Road (FS 56) Mailbox TH, Taylor River TH, Dingford Creek TH, Goldmyer Hot Springs 05/15/23. Paved section open. Gravel section to Dingford trailhead is very rough.The Goldmyer Access Report usually has updated road conditions. [b]North Fork Snoqualmie Road (FS 57) Bare, Dog, Goat, Phelps, ... 10/01/2014 A $75 permit is required to access Hancock Timber lands along the North Fork road. The road is public and you can drive through Hancock lands to reach FS areas for free, but you can't park and climb Fuller or visit other attractions on their land without the permit. Rocky Run (FS 4832) The spur (136 per Google Maps) to the backdoor TH is extra brushy but save for a nasty water channel right at the beginning and some moderate rutting about halfway in is still more or less drivable. Extra clearance would be good, don't take a car you don't want to add pinstripes to. Teanaway North Fork Teanaway road (9737) Teanaway Middle Fork (NFD 113) Jack Creek Road (9738) Stafford Creek Road 9703 Beverly turnpike road (1391) (7.28.2021, Joey) Two bad spots washing out. We were very careful and did OK in a Subaru Forester. Low clearance might not make it. Jungle Creek (FS 9701) Teanaway Butte, Way Creek trail, Jungle Creek trail "Road Closed" sign at the beginning of the road. Cle Elum Trails - road closures - [*][b]Taneum - Manastash Area
  • FSR 3350 - South Cle Elum Ridge Road
  • FSR 33 - Taneum Road
  • FSR 3100 - Manastash Road
  • FSR 3120 near 3100 Junction. [/b]
  • FSR 3100 near Buck Meadows.
  • FSR 4517-117 - Granite Creek Road.
[*]Cle Elum Valley - FSR 4308 - French Cabin at 120 Junction. [*]Cle Elum Valley Road NF-4330 [*]Swauk and Liberty FSR 9707 - Pole Patch Road - two areas - First near spur 115, the second is near 4WD319. [*]Red Top Road [/list] [b]Teanaway Ridge/Jack Creek (FS 9738) ? Mountain Loop Mountain Loop Highway, Likely to melt out by late May 2023 Green Mtn Road (FS 41) - Tupso Pass, Three Fingers, Closed @ mile 8.6 due to damage to South Fork Canyon Creek bridge. No time line for repairs. Approx 10 miles to trail head @ Tupso Pass FS 4110, Green Mtn., Pot holed..more like craters. 6/4/14 FS 4111, Canyon Lake, Closed at mile 0 due to wash out. 6/4/14 FS 42, Mt Pilchuck, reconstructed 2023 North Fork Sauk Road (FS 49), 4096 Bedal Creek High clearance recommended, brushed out. Call the Darrington Ranger District at 360-436-1155 for current information Segelsen Road (FS 18), Call the Darrington Ranger District at 360-436-1155 for current information. www.fs.usda.gov/mbs Pugh (2095), Closed (seasonal) Straight Creek Road (FS 27), Multiple washouts Suiattle River Road (FS 26), Tenas Creek Road (FS 2660), Severe fire damage after bridge, expect fallen trees Whitechuck River Road (FS 23), Washed out at mile 4, possible to bike past. C-Post Mt Higgens access. Must park near 530 and hike in. Highway 2 & Leavenworth FSR #62 and roads to Persis trailhead - Gate often CLOSED. If locked in call sheriff. Sultan Basin Road, ? Beckler River Road (FS 65), ? Chiwawa River Road (FS 6200) Phelps Creek TH, Spider Gap, Buck Creek Pass, Gate at end of paved road may be closed Icicle Creek Road (FS 7600) - Chatter Creek, 4th of July Creek, Icicle Creek, Snow Lakes In Winter, usually closed to wheeled vehicles past the 8 Mile Road junction. Eight Mile Road (FS 7601) - Enchantments, Colchuck Lake Usually closed in winter to wheeled vehicles. NFD 6024 - Baring Mountain Barclay Lake Road is closed indefinitely due to 2022 Bolt Creek Fire Ranger Road (FS 7701) 6/6/20 - gate closed at bottom North Cascades and Baker, Mt Baker Ranger District Church Mountain (FR 3040), Welcome Pass (FR 3060), rough Canyon Creek (FR 31), good condition, may have logging traffic or construction over the next several years Nooksack Road (FR 34), Deadhorse Road (FR 37), Washed out at around mile 3, Middle Fork Nooksack (FR 38), long with a good number of potholes Glacier Creek (FR 39), Washed out repaired October 2023 Thompson Creek (FR 3910) North Cascades Highway (SR 20), Cascade River Road (FR 15), Open to Park Boundary Sibley Creek, Hidden Lake (FR 1540), Road is rough but popular. Very bad section at last switchback barely passable to a Subaru. Illabot Creek Road (FR 16), very brushy and narrow. Not recommended during rain events due to the landslide risk. Mt. St. Helens Due to a fire there is no longer a shelter at Marble Mountain Sno-Park. Forest Road 10 2012. Closed. Mitchell Peak north access - from DNR: "While the forestland is managed by DNR, the only access road to the trailhead—10 Road—cuts across private landownership, and the new landowner has gated and closed access to the road just east of the intersection with the S-1000 Road. DNR does not have a recreation easement for recreation access across this road. DNR land managers are working on a solution.In the meantime, the only access to Mitchell Peak trail is from the North Siouxon Creek Trailhead, in the southern part of the Siouxon Block. The distance from this trailhead to the top of Mitchell Peak is about 13 miles." Olympic Peninsula Olympic National Park - see current road conditions. Mount Baldy, Maynard Burn, Tyler Peak - FS 2870/120, ? Mount Ellinor, FR 24 and 2419 Mount Jupiter Road The trail and access to the trailhead are closed through fall of 2023. Yakima County/ Naches Ranger District S. Fork Tieton Road 1000 wildcat 1306 road McDaniel Lake/Buck Lake Road No. 1502 1504 road Rattlesnake Mount Hood National Forest

Wiki summmary last edited by nilloc29 on Mon Nov 20, 2023 12:48 am (this post can be edited by any member)
Back to top Reply to topic
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostFri Sep 08, 2017 1:28 pm 
Friday September 08, 2017 13:11 PDT (corrected 13:26 PDT) Olympic National Park News Release Lake Crescent Highway 101 to Close Beginning Monday for Public Safety Until Completion of Rock Scaling Work PORT ANGELES, WA: Due to traffic safety concerns through the rock scaling zone the Federal Highway Administration has recommended a full closure for Highway 101 until the rock scaling is completed. The full closure is scheduled to begin Monday at 6:00 am and anticipated to last for up to four days. No further rock scaling activity will occur until the full closure on Monday. During the first planned four-hour delay for rock scaling work on Thursday, September 7 the slope was prepared to allow traffic through the area over the weekend with temporary traffic signals for alternating single-lane traffic. During the closure, Highway 101 eastbound from Forks will remain open up to the turn for Barnes Point where Lake Crescent Lodge, Storm King Information Station, NatureBridge, and the trailheads are located. Highway 101 westbound from Port Angeles will remain open up to mile marker 232/East Beach Road. Travelers to the western side of the peninsula can use SR 112 as an alternate route during the closure. “Public and worker safety is of utmost importance,” said Olympic National Park Acting Superintendent Lee Taylor. “As much as we regret the inconvenience, the closure of Highway 101 at Lake Crescent is necessary until the rock scaling work is complete.” Olympic National Park officials and project partners at the Federal Highway Administration made the decision to close Highway 101 in the rock scaling zone to all traffic for public safety. The full closure, including after work hours, will expedite the completion of rock scaling work and ensure the safety of the public until the scaling is complete. With additional crew and a waiver from the U.S. Fish and Wildlife Service to increase work hours for rock scaling, the contractor expects to complete the scaling in four days or less. Construction work will continue during the closure on other portions of the project outside the rock scaling area and travelers on Highway 101 at Lake Crescent should continue to expect half-hour delays Monday through Friday during work hours. Weekday work hours through September 23 are restricted to two hours after sunrise to two hours before sunset for areas outside the rock scaling zone. Traveling in the morning before 8:30 am and after 5:45 pm may help travelers avoid the half-hour delays. Maps of the area and access information are available on the park website at www.nps.gov/olym/planyourvisit/lake-crescent-highway-101-rehabilitation-2017-19.htm. East Beach Road Paving operations on East Beach Road are underway. September 8: Paving patches on East Beach Road, expect half-hour delays throughout the work day from 8:40 am to 5:40 pm. September 11-15: Paving bottom lift on East Beach Road (left half/right half), expect half-hour delays throughout the work day from 8:45 am to 5:30 pm. September 18-20: Top lift paving, full road width. 10-hour closures with no through traffic; local resident access only. Areas to be paved each day are to be announced. Log Cabin Resort will remain open and signage will direct traffic to Log Cabin Resort via SR 112 to Joyce-Piedmont Road or from East Beach Road depending on the location of paving operations. www.nps.gov

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostWed Sep 13, 2017 6:48 pm 
Wednesday September 13, 2017 16:55 PDT Olympic National Park News Release Update: Crews Working To Complete Rock Scaling and Reopen Lake Crescent Highway 101 May Require Until Friday PORT ANGELES, WA: The full closure of Highway 101 at Lake Crescent since Monday has allowed rock scaling work to progress safely and efficiently. The full closure was anticipated to last up to four days, however, despite aggressive efforts to complete the work in the initial timeframe the work may require an additional day. After evaluating the scaling left to complete at this point and the time necessary to clear the road and replace the concrete barriers, reopening the road may need to wait until Friday. Crews are continuing to work hard to meet the original schedule of reopening Thursday evening. However, the park is making this notification in order to keep the public informed of progress and to plan ahead. “We recognize the importance of the Highway 101 corridor to the public and the inconvenience that the closure has caused,” said Olympic National Park Acting Superintendent Lee Taylor. “The safety of the public has to take precedence.” Highway 101 will reopen as soon as possible, but travelers should plan ahead for the potential that the closure may last until Friday at 6:00 pm. Rock scaling is expected to be completed Thursday evening or Friday morning. Once the rock scaling is finished, the road will be cleared of debris and the concrete barriers will be reinstalled through the work zone. Once the barriers are in place, Highway 101 will reopen to single-lane traffic through that area. Temporary traffic signals for alternating single-lane traffic will be in place for the reopening with short delays through the weekend and after hours. Starting Monday, flaggers will control traffic during work hours for the installation of rock bolts and dowels. This work will require half-hour delays. No four-hour closures are currently scheduled in the next two weeks. Due to traffic safety concerns through the rock scaling zone the Federal Highway Administration recommended a full closure for Highway 101 until the rock scaling is completed. Olympic National Park officials and project partners at the Federal Highway Administration made the decision to close Highway 101 in the rock scaling zone to all traffic for public safety. The full closure is expediting the completion of rock scaling work and ensuring the safety of the public until the scaling is complete. With additional crew and a waiver from the U.S. Fish and Wildlife Service to increase work hours for rock scaling, the contractor now expects to complete the scaling Thursday evening or Friday morning. During the closure, Highway 101 eastbound from Forks is open up to the turn for Barnes Point where Lake Crescent Lodge, Storm King Information Station, NatureBridge, and the trailheads are located. Highway 101 westbound from Port Angeles is open up to mile marker 232/East Beach Road. Travelers to the western side of the peninsula can use SR 112 as an alternate route during the closure. Construction work will continue during the closure on other portions of the project outside the rock scaling area and travelers on Highway 101 at Lake Crescent should continue to expect half-hour delays Monday through Friday during work hours. Weekday work hours through September 23 are restricted to two hours after sunrise to two hours before sunset for areas outside the rock scaling zone. Traveling in the morning before 8:30 am and after 5:30 pm may help travelers avoid the half-hour delays. Maps of the area and access information are available on the park website at www.nps.gov/olym/planyourvisit/lake-crescent-highway-101-rehabilitation-2017-19.htm. East Beach Road Paving operations on East Beach Road are underway. September 11-15: Paving bottom lift on East Beach Road (left half/right half), expect half-hour delays throughout the work day from 8:45 am to 5:30 pm. September 18-20: Top lift paving, full road width. 10-hour closures with no through traffic; local resident access only with delays. Areas to be paved each day are to be announced. Log Cabin Resort will remain open and signage will direct traffic to Log Cabin Resort via SR 112 to Joyce-Piedmont Road or from East Beach Road depending on the location of paving operations. www.nps.gov

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostWed Sep 20, 2017 12:44 pm 
Wednesday September 20, 2017 12:27 PDT Olympic National Park News Release Weather Delays Paving Project on East Beach Road: Work to be Performed September 21 – 23, 2017 PORT ANGELES, WA: Weather has delayed the paving project on East Beach Road by one day. The original plan to pave from September 20-22 will now be performed September 21-23. East Beach Road East Beach Road paving schedule has been changed due to weather. Paving will now occur on Thursday, September 21 through Saturday, September 23. Paving will begin on Thursday at Lyre River and continue towards the intersection of Joyce-Piedmont and East Beach Roads. There will be no access to the Spruce Railroad Trail between 9:00 am and 3:00 pm on Thursday. From there paving will continue east to the Log Cabin Resort entrance. Log Cabin Resort will be accessible via US Highway 101 throughout the day on Thursday. Paving operations will continue Friday and Saturday for the east end of East Beach Road starting at the previous days ending point. Paving will close access to Log Cabin Resort via Hwy 101 between the hours of 9:00 am -5:00 pm except for emergency vehicles. Log Cabin Resort may be reached via the SR 112 route during this portion of the paving project. The message board, located just east of SR 112, will be updated to direct traffic to the route for accessing Log Cabin Resort. Work that has been completed to date on East Beach Road includes the replacement of the Log Cabin Creek culvert, which allows for fish passage, and paving patch work that began in early September. East Beach Road was built between 1911 and 1925 and provides access to private residences, Log Cabin Resort and several popular day use areas. East Beach Road links Highway 101 and Highway 112 and serves as a bypass route around the lake. Highway 101 Rock scaling is complete and drilling for rock blots and dowels will begin. Travelers on Highway 101 around Lake Crescent should continue to expect half-hour delays Monday through Friday through the rock area during work hours. Culvert work is being performed east of Lake Crescent Road in multiple locations between milepost 226 – 221, expect delays. Highway 101 road surface at Fairholme Hill has been milled, drivers are asked to use caution while driving on the rough road. Paving is scheduled for next week, weather permitting. Weekday work hours through September 23 are restricted to two hours after sunrise to two hours before sunset. Traveling in the morning before 8:00 am and after 6:00 pm can help travelers avoid the half-hour delays. After work hours and on weekends expect short delays for alternating single-lane traffic controlled by temporary traffic signals. The schedule and updated information are available on the Olympic National Park website at www.nps.gov/olym/planyourvisit/lake-crescent-highway-101-rehabilitation-2017-19.htm and the Federal Highway Administration website at https://flh.fhwa.dot.gov/projects/wa/lake-crescent/. -NPS-

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostSat Sep 23, 2017 10:37 am 
Thursday September 21, 2017 16:49 PDT Olympic National Park News Release Lake Crescent Highway 101: Six-hour overnight closure scheduled for October 3, 2017 in the Eagle Creek area on the West End of Lake Crescent PORT ANGELES, WA: In order to replace a culvert on Eagle Creek (MP 222), construction crews will be closing Highway 101 between Lake Crescent Road (MP228) and Camp David Jr Road (MP221). This closure will begin Tuesday, October 3, 2017 at 10:00 PM and end Wednesday, October 4, 2017 at 4:00 AM. The six-hour closure is needed to set up a crane that will replace the Eagle Creek culverts on the west end of the lake with a larger box culvert. The box culvert will be able to better handle large volumes of water during significant rain events and allow the passage of fish. During the overnight closure, eastbound traffic will have access to Camp David Jr. Road and westbound traffic will have access to the Barnes Point area at Lake Crescent Road. Eastbound traffic will not have access to the Barnes Point area. Travelers needing to get around the lake during the overnight closure should use SR 112 as an alternate. Emergency vehicles will follow protocols established during communication meetings. During daylight hours, construction work will continue on other portions of the project outside the Eagle Creek area. Travelers on Highway 101 around Lake Crescent should continue to expect half-hour delays Monday through Friday during work hours. Traveling in the morning before 8:30 AM and after 5:45 PM may help travelers avoid the half-hour delays. Maps of the area and access information are available on the park website at www.nps.gov/olym/planyourvisit/lake-crescent-highway-101-rehabilitation-2017-19.htm. www.nps.gov

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostSat Sep 30, 2017 4:23 pm 
Thursday September 28, 2017 07:42 PDT Olympic National Park News Release Lake Crescent Highway 101 CHANGE: The NEXT six-hour overnight closure is scheduled for October 10, 2017 in the Eagle Creek area on the West End of Lake Crescent. PORT ANGELES, WA: The closure that was originally scheduled for Tuesday, October 3, 2017 has been moved to Tuesday October 10, 2017 to better coordinate with the delivery of materials. In order to replace a culvert on Eagle Creek (MP 222), construction crews will be closing Highway 101 between Lake Crescent Road (MP228) and Camp David Jr Road (MP221). This closure will begin Tuesday, October 10, 2017 at 10:00 PM and end Wednesday, October 11, 2017 at 4:00 AM. The six-hour closure is needed to install the last pieces of the box culvert that will be replacing the existing Eagle Creek culverts. The box culvert will be able to better handle large volumes of water during significant rain events and allow the passage of fish. During the overnight closure, eastbound traffic will have access to Camp David Jr. Road, and westbound traffic will have access to the Barnes Point area at Lake Crescent Road. Eastbound US101 traffic will not have access to the Barnes Point area. Travelers needing to get around the lake during the overnight closure should use SR 112 as an alternate route. Emergency vehicles will follow protocols established during communication meetings. During daylight hours, construction work will continue on other portions of the project outside the Eagle Creek area. Travelers on Highway 101 around Lake Crescent should continue to expect half-hour delays Monday through Friday during work hours. Traveling in the morning before 7:00 AM and after 7:00 PM may help travelers avoid the half-hour delays. Maps of the area and access information are available on the park website at www.nps.gov/olym/planyourvisit/lake-crescent-highway-101-rehabilitation-2017-19.htm. www.nps.gov

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostTue Oct 03, 2017 3:03 pm 
Tuesday October 03, 2017 13:44 PDT Olympic National Park News Release Overnight Closure Cancelled for October 10 on Highway 101 at Lake Crescent PORT ANGELES, WA: The overnight closure scheduled for Tuesday, October 10, 2017 has been cancelled due to a delay in the delivery of materials to the contractor. There are currently no scheduled closures for Highway 101 at Lake Crescent. Any future closures scheduled by the contractor will be announced in advance and posted on the park website along with updated project information at http://go.nps.gov/LCHwy101Project Construction work is underway throughout the project area at Lake Crescent. Travelers on Highway 101 around Lake Crescent should continue to expect half-hour delays Monday through Friday during work hours. Culvert work and paving is ongoing west of Lake Crescent Road/Barnes Point. Travelers should expect short delays for a pilot car leading vehicles through several isolated work zones. Traffic signals are in place at two locations, please use caution. Traveling in the morning before 7:00 AM and after 7:00 PM may help travelers avoid the half-hour delays. East Beach Road paving is now complete. Striping is scheduled for Friday, October 6. Remaining work on East Beach Road includes laying shoulder aggregate, grading turnouts, and installing a concrete collar and guardrail at the Piedmont Creek culvert. Expect delays during weekday work hours. Maps of the area and updated project information are available on the park website at http://go.nps.gov/LCHwy101Project www.nps.gov

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostThu Oct 19, 2017 8:08 am 
Wednesday October 18, 2017 16:48 PDT Olympic National Park News Release Four-hour Delays To Begin October 30 on Lake Crescent Highway 101 Until Rock Bolting is Complete PORT ANGELES, WA: Lake Crescent Highway 101 will have 4-hour delays beginning Monday, October 30. These delays will occur Monday through Thursday, from 9:00 am to 1:00 pm and are anticipated to continue until the project shuts down for the winter in late November. The 4-hour delays will reduce risk to the public and increase productivity by allowing work to occur without traffic present. The 4-hour delays will also allow work to occur in the higher risk zones. “I appreciate the great inconvenience of 4-hour delays to travelers,” said Olympic National Park Superintendent Sarah Creachbaum. “However, public safety must come first.” Additional safety measures are now in effect after two recent instances of property damage during rock bolting operations, one involving a failed drill rig anchor bolt. No drilling or repositioning of drilling rigs will take place during periods of traffic movement. The park’s partner for this project, Western Federal Lands Highway Division, has “a high level of confidence that these new safety procedures will provide for safe public travel through the work zone.” Rock scaling work was completed during the complete Highway 101 closure September 11-15. The current phase of work on the rockface is referred to as rock bolting. Holes are drilled from five to twenty-five feet into the rock to secure weathered, less stable rock near the surface to structurally sound rock deeper within. Surface rock is then secured to stable rock under tension with surface plate washers and epoxy inside the drilled holes. When complete, this work will significantly mitigate the rockfall hazard in this area. During the delays, travelers to and from the western side of the peninsula can use SR 112/113 as an alternate route. Highway 101 eastbound from Forks will remain open up to the turn for Barnes Point where Lake Crescent Lodge, Storm King Information Station, NatureBridge, and the trailheads are located. Highway 101 westbound from Port Angeles will be open up to mile marker 232/East Beach Road. The Washington State Department of Transportation will be working during the delay between East Beach Road and the rock bolting zone to complete necessary maintenance. Access for emergency vehicles through the closed area will be coordinated using established communication procedures with the traffic control supervisor. Construction work will continue during the 4-hour delays on other portions of the project outside the rock bolting area and travelers on Highway 101 at Lake Crescent should continue to expect half-hour delays Monday through Friday during work hours. Traveling in the morning before 7:00 am and after 7:00 pm may help travelers avoid the half-hour delays. Maps of the area and current project information are available on the park website at http://go.nps.gov/LCHwy101Project. www.nps.gov

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostFri Oct 20, 2017 3:01 pm 
Friday October 20, 2017 14:22 PDT This message is to notify you of updated information regarding the Darrington Storm Damage Repairs Project. Darrington Road Repair Projects Heavy rains during the 2016 winter damaged numerous roads and trails across the Mt. Baker-Snoqualmie National Forest, including several roads within the Darrington Ranger District. The Forest is working to restore access for Forest users by repairing roads that have experienced storm-related damage while also maintaining aquatic and wildlife habitat standards. Proposed actions include the repair or replacement of damaged or plugged culvert pipes, construction of mechanically stabilized earth retaining wall, and excavation and placement of roadway surface and embankment material. The projects are located on NFS lands in Snohomish County, Washington, see Table 1 and Figure 1 in the notification letter for specific project locations. The proposed repairs have been included in the “Emergency Repair of Federally Owned Roads” program, or ERFO, administered by the Federal Highways Administration (FHA). The FHA is the lead Federal agency for repair efforts and the Forest is working with FHA to design the repairs for these damaged roads. Planning and design work is underway and repair work is proposed to start in summer 2018. View the complete notification letter from Ranger Forbes, including a map and summaries of the proposed repairs here. For additional information about the proposed repairs, please visit: https://www.fs.usda.gov/project/?project=49024 Thank you for your interest in the management of Mt. Baker-Snoqualmie National Forest. -Mt. Baker Snoqualmie National Forest-

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostWed Oct 25, 2017 7:49 pm 
Wednesday October 25, 2017 16:59 PDT Olympic National Park News Release Olympic Hot Springs Road Repairs Underway; Inaccessible Above Glines Canyon Overlook PORT ANGELES, WA: The Olympic Hot Springs Road in the Elwha Valley will be inaccessible to public travel above the Glines Canyon Overlook beginning Monday, October 30 through Thursday, November 2 for necessary road repairs and culvert replacement. For public safety, the portion of the road above the Glines Canyon Overlook will also be inaccessible the morning of Thursday, October 26 and is scheduled to reopen by mid-afternoon. Olympic National Park road crews are working diligently to complete the repairs and will restore access to the public as soon as possible for the upcoming weekend. After the road reopens tomorrow, the Boulder Creek Trailhead will be accessible through the weekend. However, all vehicles must be below the Glines Canyon Overlook area by 6:00 am on Monday, October 30 prior to the four-day closure. Permits are required for overnight camping in the Boulder Creek Camp area. Campfires are prohibited at the camp area and the hot springs due to extensive damage by visitors and subsequent revegetation efforts. Pets and bicycles are not permitted beyond the trailhead. For more information about backpacking and wilderness permits visit www.nps.gov/olym/planyourvisit/wilderness-permits.htm or call the Wilderness Information Center at 360-565-3100. For current road and travel information, visitors should consult the park website at www.nps.gov/olym or call the recorded Road and Weather Hotline at 360-565-3131. --NPS--

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostThu Nov 16, 2017 1:27 pm 
Thursday November 16, 2017 11:07 PST Olympic National Park News Release Lake Crescent Highway 101 to Close This Friday, November 17 from 9 a.m. to 1 p.m. For Paving PORT ANGELES, WA: Highway 101 will be closed at the rock scaling zone on Friday, November 17 from 9:00 am – 1:00 pm for paving. Paving through the rock scaling zone is necessary due to major potholes created in the road from falling rocks. The road damage is slowing traffic to the point that very few cars are able to get through the timed traffic light during non-work hours resulting in fewer cars making it through in between timed delays. Olympic National Park officials and project partners at the Federal Highway Administration made the decision to close Highway 101 in the rock scaling zone to all traffic in order to mitigate future traffic delays. Highway 101 eastbound from Forks will remain open up to the turn for Barnes Point where Lake Crescent Lodge, Storm King Information Station, NatureBridge, and the trailheads are located. Highway 101 westbound from Port Angeles will remain open up to mile marker 223/East Beach Road. Travelers to the western side of the peninsula can use SR 112 as an alternate route during the closure. Construction work will continue during the closure on other portions of the project outside the rock scaling area and travelers on Highway 101 at Lake Crescent should continue to expect half-hour delays Monday through Friday during work hours. Maps of the area and access information are available on the park website at www.nps.gov/olym/planyourvisit/lake-crescent-highway-101-rehabilitation-2017-19.htm. -NPS-

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostWed Nov 22, 2017 12:29 pm 
Tuesday November 21, 2017 15:21 PST Olympic National Park News Release Lake Crescent Highway 101 Thanksgiving Update and Winter Shutdown Information PORT ANGELES, WA: Travelers around Lake Crescent will not encounter any road work for the rest of this week as crews return home for Thanksgiving. Drivers should expect short delays for the traffic signals at the rock wall area around mile post 229 for alternating single-lane traffic. Road work delays will resume Monday, November 27. The scheduled 4-hour delays occur daily Monday through Thursday from 9:00 am to 1:00 pm and will continue into December until the rock bolting work is completed. These 4-hour delays are anticipated through December 7. Outside of the scheduled 4-hour delays drivers should continue to expect up to half-hour delays during weekday work hours until rock bolting work is completed and the project shuts down for the winter. Traveling in the morning before 7:00 am and after 7:00 pm may help travelers avoid the half-hour delays. The rest of the road work on Highway 101 at Lake Crescent is finished for the 2017 season with the exception of some clean up and installation of pavement markings around Fairholme Hill for additional safety over the winter period. The current traffic lane in the rock wall area was paved last Friday to repair road damage. The closed traffic lane will be paved prior to the winter shutdown and that section will reopen to two lanes. There will be no traffic signals during the winter, however, the lanes will be narrower than usual in the rock wall section with a reduced speed limit in that area. Drivers can find updates and maps of the project area with current project information on the park website at http://go.nps.gov/LCHwy101Project. www.nps.gov

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
Schroder
Member
Member


Joined: 26 Oct 2007
Posts: 6696 | TRs | Pics
Location: on the beach
Schroder
Member
PostWed Nov 22, 2017 5:15 pm 
Highway 530 is currently flooding west of Arlington

Back to top Reply to topic Reply with quote Send private message
Kim Brown
Member
Member


Joined: 13 Jul 2009
Posts: 6900 | TRs | Pics
Kim Brown
Member
PostWed Nov 22, 2017 6:23 pm 
Mountain Loop A creekbed disgorged its contents onto the road near Bedal. Rocks, mud, debris. From MBSNF website today: "The gravel section between Barlow pass and Darrington has several debris flow washouts with water flowing on the road. Not passable to most vehicles. These happened over night. Heavy rain remains in the forecast for the next several days. Be prepared for winter conditions including windfall trees, high water, snow and icy road surfaces. All gates are open as of Nov. 22. No cell service for most of the drive."

"..living on the east side of the Sierra world be ideal - except for harsher winters and the chance of apocalyptic fires burning the whole area." Bosterson, NWHiker's marketing expert
Back to top Reply to topic Reply with quote Send private message
MyFootHurts
Huge Member



Joined: 22 Nov 2011
Posts: 912 | TRs | Pics
Location: Kekistan
MyFootHurts
Huge Member
PostThu Nov 30, 2017 5:51 am 
Rd 23 from Randle to Trout Lake that has been closed for a couple years due to washouts is now open per Gifford Pinchot website. Its also now closed due to snow lol

Back to top Reply to topic Reply with quote Send private message
Ski
><((((°>



Joined: 28 May 2005
Posts: 12798 | TRs | Pics
Location: tacoma
Ski
><((((°>
PostThu Nov 30, 2017 3:25 pm 
Thursday November 30, 2017 13:52 PST Olympic National Park News Release Olympic Hot Springs Road in the Elwha Valley Remains Closed Due to Flood Damage Last week’s storm activity, coupled with increased runoff from warm temperatures and melting snow, resulted in flooding and significant road damage that closed the Elwha Valley’s Olympic Hot Springs Road. The road remains closed to vehicle traffic beyond the Madison Falls parking area. The increasing flows, which peaked at over 18,000 cfs, caused a change in the river pattern sending substantial flow towards the road. This resulted in a breach of the road’s low water crossing and additional damage to the road at the parking area near the former Elwha campground. The river continues to flow across the road. Park staff will be able to assess the full extent of the damage when the river goes down. Over the last two years the park has worked to maintain access into the Elwha Valley through road repairs and a temporary bridge. In addition, the park started the planning process for the future of the Olympic Hot Springs Road to address long-term, sustainable access. Part of this process includes analyzing various options such as modifying the current roadway or relocating it to an area outside the floodplain. The planning process will yield alternatives, one of which will be implemented in 2020-2021. The storm event last week also resulted in additional road closures across the park. The Upper Hoh Road was damaged by the Hoh River resulting in a washout at milepost 8 outside the park. Jefferson County public works department is currently in the process of organizing repairs. All park facilities in the Hoh Rain Forest are closed. A landslide on the Staircase Road also resulted in a closure just outside the park boundary at the Bear Gulch Picnic Area. For current road and travel information, visitors should consult the park website at www.nps.gov/olym or call the recorded Road and Weather Hotline at 360-565-3131. --NPS--

"I shall wear white flannel trousers, and walk upon the beach. I have heard the mermaids singing, each to each."
Back to top Reply to topic Reply with quote Send private message
   All times are GMT - 8 Hours
 Reply to topic
Forum Index > Trail Talk > Road Conditions / Closures
  Happy Birthday speyguy, Bandanabraids!
Jump to:   
Search this topic:

You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum